JUDD INDUSTRIAL CONTRACTING
The Complete Rebuild Project
BOAZ LOWBED
  As you can see in the video this was a large scale project.  We were able to save Mark Moceri of Judd Industrial thousands of dollars vs. replacing this folding neck trailer.

MAJOR REPAIRS BREAKDOWN
  • Replacement of the diamond plate sheet metal on the main deck floor
  • Rebuild all hydraulic cylinders
  • Replace hydraulic hoses where necessary
  • Remote mount all air brake and suspension control valves to areas that can be accessed WITHOUT jacking up the trailer
  • Rebuild complete air system for optimum performance
  • Simplify air brake system
  • Rebuild hydraulic valving and lines to allow hyd. power supply from onboard engine or to be switched to side rail mounted bulkhead fittings to be supplied from tractor wetline system
  • Complete sandblasting
  • Industrial Epoxy - Industrial Polyurethane-Automotive high gloss outer topcoat paint job
  • Complete new wiring and new LED lighting
  • Refinished Steel Wheels with Industrial High Gloss Finish

THIS WAS A TURN KEY COMPLETE REBUILD